Located in the Coweta Industrial Park Distribution Center off I-85 Exit 51, our construction division is building a 215,882 sq ft tilt-up semi-heated distribution facility. Features include 32-ft clear height, 9 x 10 ft dock doors, drive-in doors on end caps, ESFR Sprinkler, 233 ft building depth, and 120 ft deep truck court.