Located in the Coweta Industrial Park off I-85 Exit 51, our construction team completed the building shell of a 215,882 sq ft tilt-up semi-heated distribution facility. Features include 32-ft clear height, 9 x 10 ft dock doors, drive-in doors on end caps, ESFR Sprinkler, 233 ft building depth, and 120 ft deep truck court. This building was constructed using the tilt-up construction method. The construction time-lapse video below shows the project from start to finish and the tilt-up panel installation process.